{"id":1170,"date":"2019-07-29T07:05:09","date_gmt":"2019-07-29T05:05:09","guid":{"rendered":"https:\/\/www.tb-lampert.at\/natural-gas-pipeline-from-khor-mor-to-bazian-power-plant\/"},"modified":"2026-01-13T10:14:42","modified_gmt":"2026-01-13T09:14:42","slug":"natural-gas-pipeline-from-khor-mor-to-bazian-power-plant","status":"publish","type":"post","link":"https:\/\/www.tb-lampert.at\/en\/natural-gas-pipeline-from-khor-mor-to-bazian-power-plant\/","title":{"rendered":"Natural gas pipeline from Khor Mor to Bazian Power Plant"},"content":{"rendered":"<p>The implementation of the new natural gas pipeline serves to increase the supply capacity of the existing Bazian Power Plant, which is required for the power plant expansion. The project was carried out in the Kurdistan Region, Iraq.<\/p>\n<p><strong> <\/strong><\/p>\n<p><strong>Services: <\/strong><\/p>\n<ul>\n<li>Creation of maintenance instructions and manuals<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Key data:<\/strong><\/p>\n<ul>\n<li>Natural gas pipeline for power plant supply<\/li>\n<li>Total length: approx. 16 km<\/li>\n<li>Diameter: 20\u201d<\/li>\n<li>Transport capacity: 240 MMSCFD (Million Metric Standard Cubic Feet per Day)<\/li>\n<li>1 tie-in to the existing 24\u201d main pipeline at Chemchemal transfer station, including a metering station and pig trap<\/li>\n<li>1 tie-in to the existing Bazian Powerplant transfer station, including a vent stack and pig trap<\/li>\n<\/ul>\n<p><strong> <\/strong><\/p>\n<p><strong> <\/strong><strong>Period: <\/strong>2019<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The implementation of the new natural gas pipeline serves to increase the supply capacity of the existing Bazian Power Plant, which is required for the power plant expansion. The project was carried out in the Kurdistan Region, Iraq. Services: Creation of maintenance instructions and manuals &nbsp; Key data: Natural gas pipeline for power plant supply [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22],"tags":[],"class_list":["post-1170","post","type-post","status-publish","format-standard","hentry","category-oil-gas-processes"],"_links":{"self":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts\/1170","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/comments?post=1170"}],"version-history":[{"count":1,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts\/1170\/revisions"}],"predecessor-version":[{"id":1183,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts\/1170\/revisions\/1183"}],"wp:attachment":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/media?parent=1170"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/categories?post=1170"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/tags?post=1170"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}