{"id":1190,"date":"2016-05-27T11:52:41","date_gmt":"2016-05-27T09:52:41","guid":{"rendered":"https:\/\/www.tb-lampert.at\/technical-evaluation-nabucco\/"},"modified":"2016-05-27T11:52:41","modified_gmt":"2016-05-27T09:52:41","slug":"technical-evaluation-nabucco","status":"publish","type":"post","link":"https:\/\/www.tb-lampert.at\/en\/technical-evaluation-nabucco\/","title":{"rendered":"Technical evaluation &#8211; NABUCCO"},"content":{"rendered":"<p>The purpose of the pipeline system is to transport a sufficient quantity of natural gas from the various regions of the Middle East and the Caspian Sea to Europe. The pipeline route runs from Turkey via Bulgaria, Romania, and Hungary to Austria.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Services:<\/strong><\/p>\n<ul>\n<li>Evaluation of the offers for planning services of the &#8220;Local Field Engineer&#8221; (LFE)<\/li>\n<li>Assessment and final report of the planning services for the Austrian section<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Key data:<\/strong><\/p>\n<ul>\n<li>Total length: 2,841 km, offshore section approx. 17 km<\/li>\n<li>Diameter: 56&#8243;<\/li>\n<li>Operating pressure: 90 bar<\/li>\n<li>Capacity: 25.5 billion m<sup>3<\/sup>\/year (base flow case) &#8211; 31.0 billion m<sup>3<\/sup>\/year (high flow case)<\/li>\n<li>2 compressor stations<\/li>\n<li>7 measuring and transfer stations<\/li>\n<li>6 launching and receiving pig traps<\/li>\n<li>Several tapping points<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Period: <\/strong>2008<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The purpose of the pipeline system is to transport a sufficient quantity of natural gas from the various regions of the Middle East and the Caspian Sea to Europe. The pipeline route runs from Turkey via Bulgaria, Romania, and Hungary to Austria.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22],"tags":[],"class_list":["post-1190","post","type-post","status-publish","format-standard","hentry","category-oil-gas-processes"],"_links":{"self":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts\/1190","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/comments?post=1190"}],"version-history":[{"count":0,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts\/1190\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/media?parent=1190"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/categories?post=1190"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/tags?post=1190"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}