{"id":1191,"date":"2016-05-27T11:53:33","date_gmt":"2016-05-27T09:53:33","guid":{"rendered":"https:\/\/www.tb-lampert.at\/abu-dhabi-crude-oil-pipeline-project\/"},"modified":"2016-05-27T11:53:33","modified_gmt":"2016-05-27T09:53:33","slug":"abu-dhabi-crude-oil-pipeline-project","status":"publish","type":"post","link":"https:\/\/www.tb-lampert.at\/en\/abu-dhabi-crude-oil-pipeline-project\/","title":{"rendered":"Abu Dhabi Crude Oil Pipeline Project"},"content":{"rendered":"<p>The purpose of the pipeline system is to transport crude oil from Abu Dhabi&#8217;s onshore crude oil production in Habshan (Persian Gulf) to the Main Oil Terminal in Fujairah (Indian Ocean).<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Services:<\/strong><\/p>\n<ul>\n<li>Management and coordination of the creation and release process of the operation and maintenance manuals<\/li>\n<li>Verification and release of the operation and maintenance manuals for the pipeline and facilities<\/li>\n<li>Verification and release of the operation and maintenance manuals of the individual suppliers<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Key data:<\/strong><\/p>\n<ul>\n<li>A 48&#8243; main pipeline with a total length of approx. 404 km<\/li>\n<li>Transport capacity: 1.5 MMBPD (Million Barrels per day)<\/li>\n<li>Manifold and integration into the existing pipeline systems.<\/li>\n<li>1 main pumping station in Habshan, equipped with buffer and relief tanks, electrically driven main pumps and booster pumps.<\/li>\n<li>1 intermediate pumping station in Sweihen, equipped with pressure relief tanks, electrically driven main pumps and a station bypass.<\/li>\n<li>1 Main Oil Terminal (MOT) in Fujairah, equipped with oil storage and relief tanks, electrically driven transfer pumps, pressure control systems and various auxiliary systems<\/li>\n<li>MOT oil loading facilities with three Single Point Mooring (SPM) systems for oil tankers with a loading capacity of 80,000 bbl\/hr each (barrels \/ hour) <\/li>\n<li>10 line valve stations<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Period:<\/strong> 2011 to 2012<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The purpose of the pipeline system is to transport crude oil from Abu Dhabi&#8217;s onshore crude oil production in Habshan (Persian Gulf) to the Main Oil Terminal in Fujairah (Indian Ocean).<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22],"tags":[],"class_list":["post-1191","post","type-post","status-publish","format-standard","hentry","category-oil-gas-processes"],"_links":{"self":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts\/1191","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/comments?post=1191"}],"version-history":[{"count":0,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts\/1191\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/media?parent=1191"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/categories?post=1191"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/tags?post=1191"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}