{"id":1193,"date":"2016-05-27T11:54:39","date_gmt":"2016-05-27T09:54:39","guid":{"rendered":"https:\/\/www.tb-lampert.at\/fujairah-phase-2-water-transmission-system\/"},"modified":"2016-05-27T11:54:39","modified_gmt":"2016-05-27T09:54:39","slug":"fujairah-phase-2-water-transmission-system","status":"publish","type":"post","link":"https:\/\/www.tb-lampert.at\/en\/fujairah-phase-2-water-transmission-system\/","title":{"rendered":"Fujairah Phase 2 Water Transmission System"},"content":{"rendered":"<p>Expansion of the existing drinking water transport system from the Fujairah desalination plant in the United Arab Emirates to supply individual regions and settlements in the interior.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Services:<\/strong><\/p>\n<ul>\n<li>Verification of process technology with regard to instrumentation, control, and regulation (ICR) and operational flexibility<\/li>\n<li>Creation of the operating, control, and automation philosophy for the overall system<\/li>\n<li>Creation of documentation for pre-commissioning, commissioning, line fill and start-up<\/li>\n<li>Creation of acceptance specifications (&#8220;Performance and Reliability Tests&#8221;)<\/li>\n<li>Creation of operating manuals and the maintenance concept<\/li>\n<li>Commissioning and start-up<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Key data:<\/strong><\/p>\n<ul>\n<li>A total of 3 parallel main lines<\/li>\n<li>Total length: over 170 km<\/li>\n<li>Diameter: up to 64&#8243;<\/li>\n<li>Capacity: over 1 million m<sup>3<\/sup>\/d<\/li>\n<li>1 Pumping station<\/li>\n<li>15 receiving stations planned<\/li>\n<li>1 elevated tank<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Period: <\/strong>2008 to 2012<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Expansion of the existing drinking water transport system from the Fujairah desalination plant in the United Arab Emirates to supply individual regions and settlements in the interior.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21],"tags":[],"class_list":["post-1193","post","type-post","status-publish","format-standard","hentry","category-water-supply"],"_links":{"self":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts\/1193","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/comments?post=1193"}],"version-history":[{"count":0,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts\/1193\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/media?parent=1193"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/categories?post=1193"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/tags?post=1193"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}