{"id":1195,"date":"2016-05-27T11:55:28","date_gmt":"2016-05-27T09:55:28","guid":{"rendered":"https:\/\/www.tb-lampert.at\/hofuf-water-transmission-system\/"},"modified":"2016-05-27T11:55:28","modified_gmt":"2016-05-27T09:55:28","slug":"hofuf-water-transmission-system","status":"publish","type":"post","link":"https:\/\/www.tb-lampert.at\/en\/hofuf-water-transmission-system\/","title":{"rendered":"Hofuf Water Transmission System"},"content":{"rendered":"<p>Expansion of the existing Hofuf Water Transmission System to increase the previous supply capacity from 20 MIGD (91,000 m3\/d) to 40 MIGD (182,000 m3\/d).<\/p>\n<p>Expansion of the existing &#8220;Origin Pump Station&#8221; in Al Aziziah by two additional main pumps, renewal of the three existing main pumps, construction of three additional surge vessels and renewal of the existing control technology.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Services:<\/strong><\/p>\n<ul>\n<li>Creation of a new control and operating philosophy for the required operational flexibility<\/li>\n<li>Preparation of the documentation for station fill, start-up and performance tests for the newly installed main pumps<\/li>\n<li>Preparation of the operating manuals and operating instructions for the system expansion<\/li>\n<li>Commissioning and start-up<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Key data:<\/strong><\/p>\n<ul>\n<li>A main pipeline DN 1400 with a total length of approx. 135 km<\/li>\n<li>A branch line DN 400 with a total length of approx. 8 km<\/li>\n<li>Transport capacity: 182,000 m3\/d<\/li>\n<li>1 expanded main pumping station<\/li>\n<li>2 existing transfer stations<\/li>\n<li>1 existing surge tank with a re-circulation pumping station<\/li>\n<li>5 line valve stations<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Period:<\/strong> 2011 to 2012<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Expansion of the existing Hofuf Water Transmission System to increase the previous supply capacity from 20 MIGD (91,000 m3\/d) to 40 MIGD (182,000 m3\/d).<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21],"tags":[],"class_list":["post-1195","post","type-post","status-publish","format-standard","hentry","category-water-supply"],"_links":{"self":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts\/1195","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/comments?post=1195"}],"version-history":[{"count":0,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts\/1195\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/media?parent=1195"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/categories?post=1195"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/tags?post=1195"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}