{"id":1198,"date":"2016-05-27T11:58:39","date_gmt":"2016-05-27T09:58:39","guid":{"rendered":"https:\/\/www.tb-lampert.at\/ras-al-khair-hafar-al-batin-water-transmission-system\/"},"modified":"2016-05-27T11:58:39","modified_gmt":"2016-05-27T09:58:39","slug":"ras-al-khair-hafar-al-batin-water-transmission-system","status":"publish","type":"post","link":"https:\/\/www.tb-lampert.at\/en\/ras-al-khair-hafar-al-batin-water-transmission-system\/","title":{"rendered":"Ras Al Khair &#8211; Hafar Al Batin Water Transmission System"},"content":{"rendered":"<p>Transport of drinking water from the Ras Al Zaur desalination plant in the Eastern Province of Saudi Arabia, via the newly constructed Ras Al Khair pumping station, to supply the cities and towns of Nuairiyah, Ibn Hethlain, Qaryat Al Oliyah, Sairah, Sadawi, Al Qaysumah, and Hafar Al Batin<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Services:<\/strong><\/p>\n<ul>\n<li>Review of process engineering with regard to instrumentation, control, and regulation (ICR) and operational flexibility<\/li>\n<li>Creation of the operating, control, and automation philosophy for the overall system<\/li>\n<li>Creation of control concepts for functional groups and subsystems<\/li>\n<li>Creation of the higher-level process diagrams and verification of the detailed P&amp;ID diagrams<\/li>\n<li>Creation of the operating manuals, detailed technical descriptions, and operating instructions for the overall system<\/li>\n<li>Conceptual design and verification of the commissioning documentation<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Key data:<\/strong><\/p>\n<ul>\n<li>One main pipeline<\/li>\n<li>Total length: approx. 352 km<\/li>\n<li>Diameter: DN 1100<\/li>\n<li>Transport capacity: 110,000 m3\/d<\/li>\n<li>1 new main pumping station<\/li>\n<li>7 new receiving stations with tanker filling systems<\/li>\n<li>7 new line valve stations<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Period:<\/strong> 2011 to 2015<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Transport of drinking water from the Ras Al Zaur desalination plant in the Eastern Province of Saudi Arabia, via the newly constructed Ras Al Khair pumping station, to supply the cities and towns of Nuairiyah, Ibn Hethlain, Qaryat Al Oliyah, Sairah, Sadawi, Al Qaysumah, and Hafar Al Batin &nbsp; Services: Review of process engineering with [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21],"tags":[],"class_list":["post-1198","post","type-post","status-publish","format-standard","hentry","category-water-supply"],"_links":{"self":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts\/1198","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/comments?post=1198"}],"version-history":[{"count":0,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts\/1198\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/media?parent=1198"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/categories?post=1198"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/tags?post=1198"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}