{"id":1200,"date":"2019-07-29T07:00:24","date_gmt":"2019-07-29T05:00:24","guid":{"rendered":"https:\/\/www.tb-lampert.at\/arafat-taif-water-transmission-system\/"},"modified":"2026-01-13T10:16:21","modified_gmt":"2026-01-13T09:16:21","slug":"arafat-taif-water-transmission-system","status":"publish","type":"post","link":"https:\/\/www.tb-lampert.at\/en\/arafat-taif-water-transmission-system\/","title":{"rendered":"Arafat Taif Water Transmission System"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"1200\" class=\"elementor elementor-1200 elementor-745\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-60d4a102 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"60d4a102\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-7abeceef\" data-id=\"7abeceef\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-6bf0713f elementor-widget elementor-widget-text-editor\" data-id=\"6bf0713f\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Transport of drinking water from the existing tank farm near Arafat in the Western Province of Saudi Arabia via two newly constructed pumping stations to supply the Strategic Tank Farm near Taif.<\/p><p><strong>Services:<\/strong><\/p><ul><li>FEED verification<\/li><li>Technical expertise in the creation of the operating, control, and automation philosophy for the overall system<\/li><li>Selected planning services for mechanical engineering, electrical engineering, and control technology<\/li><li>Creation of the commissioning instructions and manuals<\/li><li>Creation of the operating instructions and manuals<\/li><\/ul><p> <\/p><p><strong>Key data:<\/strong><\/p><ul><li>Total length approx. 45 km<\/li><li>Diameter: DN 1500<\/li><li>Capacities:<ul><li>Phase-1, 176,400 m<sup>3<\/sup>\/d<\/li><li>Phase-2, 322,105 m<sup>3<\/sup>\/d<\/li><\/ul><\/li><li>2 new main pumping stations<\/li><li>1 transfer station at the Strategic Tank Farm near Taif<\/li><\/ul><p> <\/p><p><strong>Period: <\/strong>2018 to 2023<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Transport of drinking water from the existing tank farm near Arafat in the Western Province of Saudi Arabia via two newly constructed pumping stations to supply the Strategic Tank Farm near Taif. Services: FEED verification Technical expertise in the creation of the operating, control, and automation philosophy for the overall system Selected planning services for [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21],"tags":[],"class_list":["post-1200","post","type-post","status-publish","format-standard","hentry","category-water-supply"],"_links":{"self":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts\/1200","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/comments?post=1200"}],"version-history":[{"count":1,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts\/1200\/revisions"}],"predecessor-version":[{"id":1201,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts\/1200\/revisions\/1201"}],"wp:attachment":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/media?parent=1200"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/categories?post=1200"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/tags?post=1200"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}