{"id":1206,"date":"2016-05-27T12:05:09","date_gmt":"2016-05-27T10:05:09","guid":{"rendered":"https:\/\/www.tb-lampert.at\/water-supply-to-adco-gasco-facilities-at-bu-hasa-and-habshan\/"},"modified":"2016-05-27T12:05:09","modified_gmt":"2016-05-27T10:05:09","slug":"water-supply-to-adco-gasco-facilities-at-bu-hasa-and-habshan","status":"publish","type":"post","link":"https:\/\/www.tb-lampert.at\/en\/water-supply-to-adco-gasco-facilities-at-bu-hasa-and-habshan\/","title":{"rendered":"Water Supply to ADCO\/GASCO Facilities at BU HASA and HABSHAN"},"content":{"rendered":"<p>Drinking water supply from the newly constructed main pumping station to the individual transfer stations in Habshan and Bu Hasa in the Emirate of Abu Dhabi (United Arab Emirates).<\/p>\n<p>The water supply system consists of a common main pumping station and two independent pipeline systems:<\/p>\n<ul>\n<li>Main line 15.5 km (DN500) to Habshan<\/li>\n<li>Main line 44.5 km (DN400) to Bu Hasa<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Services:<\/strong><\/p>\n<ul>\n<li>Preparation of the documentation for the commissioning of the process engineering plant components and main components<\/li>\n<li>Preparation of the documentation for the trial operation of the entire plant<\/li>\n<li>Preparation of the acceptance documentation (\u201cReliability and Performance Tests\u201d)<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Key data:<\/strong><\/p>\n<ul>\n<li>2 main lines<\/li>\n<li>Total length: 60 km<\/li>\n<li>Diameter: DN 400, DN 500<\/li>\n<li>Transport capacity:\n<ul>\n<li>22,896 m3\/d to Habshan<\/li>\n<li>8,880 m3\/d to Bu Hasa<\/li>\n<\/ul>\n<\/li>\n<li>1 newly constructed main pumping station<\/li>\n<li>9 newly constructed transfer stations<\/li>\n<li>Integration into existing pipeline systems<\/li>\n<li>2 line valve stations<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Period:<\/strong> 2014 to 2015<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Drinking water supply from the newly constructed main pumping station to the individual transfer stations in Habshan and Bu Hasa in the Emirate of Abu Dhabi (United Arab Emirates).<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21],"tags":[],"class_list":["post-1206","post","type-post","status-publish","format-standard","hentry","category-water-supply"],"_links":{"self":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts\/1206","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/comments?post=1206"}],"version-history":[{"count":0,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts\/1206\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/media?parent=1206"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/categories?post=1206"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/tags?post=1206"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}