{"id":1209,"date":"2016-05-27T11:51:29","date_gmt":"2016-05-27T09:51:29","guid":{"rendered":"https:\/\/www.tb-lampert.at\/natural-gas-supply-for-the-graz-combined-heat-and-power-plant\/"},"modified":"2016-05-27T11:51:29","modified_gmt":"2016-05-27T09:51:29","slug":"natural-gas-supply-for-the-graz-combined-heat-and-power-plant","status":"publish","type":"post","link":"https:\/\/www.tb-lampert.at\/en\/natural-gas-supply-for-the-graz-combined-heat-and-power-plant\/","title":{"rendered":"Natural gas supply for the Graz combined heat and power plant"},"content":{"rendered":"<p>Secure and reliable natural gas supply for the gas turbine system and the auxiliary boiler house of the combined heat and power plant (CCPP process) at the Graz site.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Services:<\/strong><\/p>\n<ul>\n<li>Process engineering layouts and conception<\/li>\n<li>Component layout and specification<\/li>\n<li>Process flow diagrams (P&amp;ID)<\/li>\n<li>System piping and building layout plans<\/li>\n<li>Technical project description (submission to authorities)<\/li>\n<li>Variant investigations and route study through the densely populated urban area of Graz<\/li>\n<li>Feasibility study with cost estimate<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Key data:<\/strong><\/p>\n<ul>\n<li>Total length approx. 8.5 km<\/li>\n<li>Diameter DN 400<\/li>\n<li>Operating pressure 70 bar<\/li>\n<li>Capacity: 115,000 Nm<sup>3<\/sup>\/h<\/li>\n<li>Integration into existing gate valve station SS G8 valve group (manifold) and connection to the existing high-pressure line DN 200, 70 bar.<\/li>\n<li>Gas pressure control system with gas filtering, gas preheating, measuring and control sections as well as multi-circuit cooling system and various auxiliary systems<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Period: <\/strong>2008<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Secure and reliable natural gas supply for the gas turbine system and the auxiliary boiler house of the combined heat and power plant (CCPP process) at the Graz site.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22],"tags":[],"class_list":["post-1209","post","type-post","status-publish","format-standard","hentry","category-oil-gas-processes"],"_links":{"self":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts\/1209","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/comments?post=1209"}],"version-history":[{"count":0,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts\/1209\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/media?parent=1209"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/categories?post=1209"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/tags?post=1209"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}