{"id":1212,"date":"2016-05-27T11:50:27","date_gmt":"2016-05-27T09:50:27","guid":{"rendered":"https:\/\/www.tb-lampert.at\/feasibility-study-for-the-linz-natural-gas-storage-station\/"},"modified":"2016-05-27T11:50:27","modified_gmt":"2016-05-27T09:50:27","slug":"feasibility-study-for-the-linz-natural-gas-storage-station","status":"publish","type":"post","link":"https:\/\/www.tb-lampert.at\/en\/feasibility-study-for-the-linz-natural-gas-storage-station\/","title":{"rendered":"Feasibility study for the Linz natural gas storage station"},"content":{"rendered":"<p>Expansion of the existing gas storage facility at the Linz DC site to increase storage and supply capacities by integrating a natural gas compressor system into the existing plant.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Services:<\/strong><\/p>\n<ul>\n<li>Variant studies and process engineering concept<\/li>\n<li>Building and installation concept for integration into the existing plant<\/li>\n<li>Piping and apparatus engineering integration into the existing plant<\/li>\n<li>Operational and control engineering integration into the existing plant<\/li>\n<li>Determination of investment costs and ongoing operating costs<\/li>\n<li>Realization date and resource plan<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Key data:<\/strong><\/p>\n<ul>\n<li>Tube storage: Storage volume 5,000 Nm<sup>3<\/sup>, operating pressure: 70 bar<\/li>\n<li>Spherical storage: Storage volume 15,000 Nm<sup>3<\/sup>, operating pressure 8 bar<\/li>\n<li>One inlet control section: Capacity 40,000 Nm<sup>3<\/sup>\/h, operating pressure 40 bar<\/li>\n<li>Natural gas compressor system: Capacity 25,000 Nm<sup>3<\/sup>\/h, operating pressure 70 bar<\/li>\n<li>Outlet control sections: Capacity 80,000 Nm<sup>3<\/sup>\/h, operating pressure 70 bar<\/li>\n<li>Multi-circuit cooling system with cooling tower<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Period: <\/strong>2008<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Expansion of the existing gas storage facility at the Linz DC site to increase storage and supply capacities by integrating a natural gas compressor system into the existing plant.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22],"tags":[],"class_list":["post-1212","post","type-post","status-publish","format-standard","hentry","category-oil-gas-processes"],"_links":{"self":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts\/1212","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/comments?post=1212"}],"version-history":[{"count":0,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/posts\/1212\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/media?parent=1212"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/categories?post=1212"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tb-lampert.at\/en\/wp-json\/wp\/v2\/tags?post=1212"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}