Yanbu Madina Phase 4 Water Transmission System

Transport of drinking water from the expanded tank farm at the Yanbu desalination plant in the western province of Saudi Arabia to supply the city of Madinah.

Services:

  • FEED verification
  • Operating, control and automation philosophy incl. Functional descriptions
  • Process flow diagrams (PFDs, P&IDs)
  • Operating manuals
  • Commissioning instructions and documentation


Key data:

  • Main pipeline DN 2100
  • Total length approx. 195 km
  • Capacities: Standard 450,000 m3/d
    Exceptional 550,000 m3/d
    Backflow 233,000 m3/d
  • Expansion of the existing tank farm
  • 2 main pumping stations
  • 2 elevated tanks
  • 4 receiving stations


Period: 2019 to 2025

WordPress Cookie Notice by Real Cookie Banner