Construction of a new branch line from the existing Jubail – Riyadh Twin Pipeline for the drinking water supply of the Riyas NGL Fractionation Plant (RNGLF).
Services:
- FEED verification
- Hydraulic and process simulations
- Operating, control, and automation philosophy
- Functional descriptions
- Process flow diagrams (PFD)
Key data:
- Supply line DN300
- Total length approx. 9 km
- Capacity: 10,000 m3/d
- 1 transfer station
- 1 receiving station
Period: 2024 to 2025