Transport of drinking water from the existing pumping station in Madinat Zayed via the new pumping station in Mezairah to the receiving station at the Qusahwira Palace in the Al Dhafra Region, UAE.
Services:
- FEED verification
- Operating, control, and automation philosophy, including function descriptions
- Process diagrams (PFDs, P&IDs)
- Mechanical and piping planning
- Electrical engineering planning
- Instrumentation and control (I) planning
- Operating manuals
- Commissioning instructions and documentation
- Commissioning management
Key data:
- Main pipeline DN 1200
- Total length approx. 200 km
- Capacity: 172,000 m3/d
- 2 pumping stations
- 20 receiving and transfer stations
Period: 2020 to 2023