Natural gas supply for the Graz combined heat and power plant

Secure and reliable natural gas supply for the gas turbine system and the auxiliary boiler house of the combined heat and power plant (CCPP process) at the Graz site.

 

Services:

  • Process engineering layouts and conception
  • Component layout and specification
  • Process flow diagrams (P&ID)
  • System piping and building layout plans
  • Technical project description (submission to authorities)
  • Variant investigations and route study through the densely populated urban area of Graz
  • Feasibility study with cost estimate

 

Key data:

  • Total length approx. 8.5 km
  • Diameter DN 400
  • Operating pressure 70 bar
  • Capacity: 115,000 Nm3/h
  • Integration into existing gate valve station SS G8 valve group (manifold) and connection to the existing high-pressure line DN 200, 70 bar.
  • Gas pressure control system with gas filtering, gas preheating, measuring and control sections as well as multi-circuit cooling system and various auxiliary systems

 

Period: 2008