Expansion of the existing gas storage facility at the Linz DC site to increase storage and supply capacities by integrating a natural gas compressor system into the existing plant.
Services:
- Variant studies and process engineering concept
- Building and installation concept for integration into the existing plant
- Piping and apparatus engineering integration into the existing plant
- Operational and control engineering integration into the existing plant
- Determination of investment costs and ongoing operating costs
- Realization date and resource plan
Key data:
- Tube storage: Storage volume 5,000 Nm3, operating pressure: 70 bar
- Spherical storage: Storage volume 15,000 Nm3, operating pressure 8 bar
- One inlet control section: Capacity 40,000 Nm3/h, operating pressure 40 bar
- Natural gas compressor system: Capacity 25,000 Nm3/h, operating pressure 70 bar
- Outlet control sections: Capacity 80,000 Nm3/h, operating pressure 70 bar
- Multi-circuit cooling system with cooling tower
Period: 2008