Variant analysis Pipeline Bratislava-Schwechat

Variant analysis for various operating scenarios of crude oil and product pipelines between the Schwechat and Slovnaft (Bratislava) refineries.

 

Services:

  • Variant analyses and process engineering concept
  • Hydraulic pre-dimensioning and design of the main components
  • Determination of investment costs and ongoing operating costs
  • Realization date and resource plan

 

Key data:

  • Total length: 58 km
  • Diameter: 16″
  • Capacity: 3 -5 Mt/a
  • Pumping station for crude oil
  • Pumping station for products
  • Transfer stations for crude oil and products
  • Tank farms and intermediate tanks

 

Period: 2008

WordPress Cookie Notice by Real Cookie Banner