The purpose of the pipeline system is to transport crude oil from Abu Dhabi’s onshore crude oil production in Habshan (Persian Gulf) to the Main Oil Terminal in Fujairah (Indian Ocean).
Services:
- Management and coordination of the creation and release process of the operation and maintenance manuals
- Verification and release of the operation and maintenance manuals for the pipeline and facilities
- Verification and release of the operation and maintenance manuals of the individual suppliers
Key data:
- A 48″ main pipeline with a total length of approx. 404 km
- Transport capacity: 1.5 MMBPD (Million Barrels per day)
- Manifold and integration into the existing pipeline systems.
- 1 main pumping station in Habshan, equipped with buffer and relief tanks, electrically driven main pumps and booster pumps.
- 1 intermediate pumping station in Sweihen, equipped with pressure relief tanks, electrically driven main pumps and a station bypass.
- 1 Main Oil Terminal (MOT) in Fujairah, equipped with oil storage and relief tanks, electrically driven transfer pumps, pressure control systems and various auxiliary systems
- MOT oil loading facilities with three Single Point Mooring (SPM) systems for oil tankers with a loading capacity of 80,000 bbl/hr each (barrels / hour)
- 10 line valve stations
Period: 2011 to 2012