Construction of a new branch line from the existing Jeddah 3 supply line for the drinking water supply of the MODON Jeddah Second Industrial City.
Services:
- FEED verification
- Hydraulic and process simulations
- Operating, control and automation philosophy incl. Functional descriptions
- Process flow diagrams (PFD)
Key data:
- Supply line DN 500
- Total length approx. 7 km
- Capacity: 30,000 m3/d
- 1 transfer station
- 1 receiving station
Period: 2024 to 2025