The purpose of the pipeline system is to feed crude oil from the existing crude oil production center near Taq Taq in Kurdistan (Iraq) via the Faysh Khabur Terminal into the existing Iraq – Turkey Pipeline (ITP).
Services:
- Peer review of the FEED and verification of the technical specification
Key data:
- A main oil pipeline
- Total length: approx. 250 km
- Diameter 24″
- Transport capacity: 420,000 MMBPD (Million Barrels per day)
- 1 main pumping station in Taq Taq, consisting of tank storage, electrically driven booster pumps and diesel-driven main pumps, transfer metering and control station and necessary auxiliary systems.
- 1 intermediate pumping station, equipped with diesel-driven main pumps and necessary auxiliary systems
- 1 Main Oil Terminal in Faysh Khabur, consisting of tank storage, electrically driven booster pumps and diesel-driven main pumps, transfer metering and control station and necessary auxiliary systems.
- 8 line valve stations and water crossings
Period: 2012