Construction of a new supply line from the existing pipeline systems for the drinking water supply of Jeddah 3 Industrial City and the CMZ receiving station.
Services:
- Review of the FEED
- Hydraulic and process simulations
- Operating, control and automation philosophy incl. Functional descriptions
- Process diagrams (PFD, R&Is)
- Instrumentation and control planning
Key data:
- Supply line DN900
- Total length approx. 12 km
- Capacity: 42,034 m3/d
- 1 tie-in station
- 1 measuring and transfer station
- 2 receiving stations
Period: 2019 to 2023